Megaprojects create their own category of risk. When a program spans hundreds of workers, thousands of documents, and multiple contracts, small breakdowns in information compound fast — and by the time they surface as cost or schedule problems, they’re expensive to unwind.
Join us on Thursday, September 17 at 2:00 p.m. EDT when Pattern Energy walks through how the team kept documents, schedules, contracts, and change orders aligned at such a large scale — and what it took to build an information infrastructure that could keep pace with the physical one.
You will learn:
- Why megaprojects require a different approach to project controls
- How SunZia connected project teams, workflows, and data across functions
- How the project team improve visibility into cost, schedule, contracts, and change
Registering is easy, just click the link here.