We have an estimate that is being loaded into Control. The estimate includes child-level items that share the same account code but have different units of measure. For example, pipe is measured in LF, while fittings are measured in EA. Both fall under the same account code, which is set up as LF. Apparently, when the estimate is loaded into Control, this creates an issue because the fittings have a UOM of EA, which does not match the account code, causing the import to be rejected. I assume this should be a relatively simple fix—perhaps we need to load a secondary UOM or make a similar adjustment. Any help or guidance would be appreciated. Thanks.