We are filling out work packages in Plan in the Workspace section. The Budget and Components are loaded through an upload, and then we are filling in the forms manually. A lot of these quality forms and work sequences are the same. Is there a way to quickly populate these after the workpackages have already been created? Copying from one package to another would be ideal.